Pre-installation checks
Confirm drawings, foundations, access, lifting, utilities, permits and installation sequence.

Independent support for food-processing and packaging machinery installation, commissioning, start-up and performance acceptance.
New equipment can arrive on time yet fail to achieve output because foundations, utilities, interfaces, controls, product conditions, operator training or acceptance criteria were not coordinated. FFT Services helps manage readiness from pre-installation checks through trials and controlled handover.
The service can support customer-purchased machinery, imported equipment, line relocations, replacement assets and multi-supplier production systems.
Independent support for food-processing and packaging machinery installation, commissioning, start-up and performance acceptance.
Confirm drawings, foundations, access, lifting, utilities, permits and installation sequence.
Review positioning, levelling, alignment, guarding, lubrication and maintainability.
Coordinate upstream, downstream, utilities, electrical, controls, drainage and exhaust connections.
Define dry tests, utility tests, safety checks, product trials and record requirements.
Ensure operators and maintenance teams understand operation, changeover, cleaning and inspection.
Measure agreed capacity, quality, waste, availability and operating conditions before handover.
Review design, supply boundaries, site readiness and installation method.
Coordinate safe placement, assembly, interfaces, inspections and punch-list closure.
Test subsystems and integrated operation progressively under controlled conditions.
Verify agreed results, record open items and transfer ownership to factory teams.

Yes. FFT Services can coordinate local readiness and interfaces while working with the OEM’s installation and commissioning responsibilities.
Product specification, raw material, packaging, operators, run duration, capacity, quality, waste, utilities and allowable exclusions should be defined before the test.
Yes. Ramp-up support, issue investigation, optimisation and follow-up performance verification can be included.
Share the product, process, equipment, present condition, available data and expected result. FFT Services will recommend an appropriate first step.