Expansion basis
Validate demand, present bottlenecks, target capacity, product mix and operating assumptions.

Engineering support for capacity expansion, new production lines and modifications inside operating food factories where space, shutdown time, hygiene and interfaces are constrained.
An operating factory cannot be treated like an empty construction site. Existing production, food safety, people, utilities, access, structure and shutdown windows create interdependent risks. FFT Services helps define the existing condition, plan the interfaces and sequence implementation with minimal disruption.
Support is available for debottlenecking, line additions, equipment replacement, room modifications, utility upgrades and staged expansion of food-manufacturing facilities.
Engineering support for capacity expansion, new production lines and modifications inside operating food factories where space, shutdown time, hygiene and interfaces are constrained.
Validate demand, present bottlenecks, target capacity, product mix and operating assumptions.
Confirm dimensions, services, access, structure, drainage and undocumented site constraints.
Define mechanical, electrical, controls, utility, building and process connections.
Plan off-line fabrication, temporary arrangements, shutdown activities and restart priorities.
Control dust, contamination, personnel routes, cleaning and work segregation.
Prepare commissioning, product trials, training, spares and performance verification.
Confirm the business case, existing condition and principal constraints.
Develop the selected concept, interfaces, responsibilities and shutdown requirements.
Complete enabling work, procurement, prefabrication and detailed execution planning.
Install, commission, restart and verify performance through a controlled handover.

Often yes, but work zones, contamination control, temporary services, access and shutdown tie-ins must be planned around the factory risk assessment.
Maximise surveys, approvals, prefabrication, testing and enabling work before shutdown, then define a detailed sequence with clear responsibilities and contingency actions.
Yes. Capacity, reliability, quality, utilities, space, lifecycle cost and implementation risk can be compared before selecting the preferred approach.
Share the product, process, equipment, present condition, available data and expected result. FFT Services will recommend an appropriate first step.